Top.Mail.Ru

Relocation (Reconstruction) of Gas Pipeline Sections. Cost Calculation of Design Documentation. Estimates and Surveys. SRO Permits. Accredited by PJSC Gazprom. BIM Modeling

Relocation (Reconstruction) of Gas Pipeline Sections

due to the construction of new facilities within the minimum permissible clearance zone

Gas pipeline relocation under roadway

During the construction and reconstruction of highways and railways, power lines (including overhead transmission lines), airport runways, and other industrial and civil infrastructure in proximity to existing main gas pipelines, conflicts arise with violations of minimum permissible clearance distances from pipelines and valve stations to buildings and structures.

Gas pipeline engineering schematic

When such issues arise, relocation (re-routing) of main gas pipelines and relocation of valve stations is required in order to comply with standard safety clearances to structures.

Gas pipeline engineering schematic
Pipeline welding works

When roads or overhead power lines under construction intersect main gas pipelines, pipeline reconstruction is also required to upgrade pipeline safety category and ensure standard burial depth at crossings.

We have accumulated extensive experience resolving these complex challenges.

Gas pipeline facility

Submit an Application

By clicking "Submit", I give my consent to the processing of my personal data