INDIVIDUAL AND CENTRAL HEATING SUBSTATIONS (IHS and CHS)
DESIGN, PROCUREMENT, INSTALLATION, COMMISSIONING
A Heating Substation is a connection hub between consumers and external district heating networks, designed for heat carrier preparation, parameter regulation before distribution to local building loops, and accurate heat energy metering.
CONSTRUCTION TYPES
Utility Connection
Reconstruction
Technical Modernization

IHS Schematic Diagram
Company LLC Energy Plus is an accredited partner of PJSC MOEK with full statutory licenses for hazardous industrial facilities (OPO). We successfully engineer and deploy pressurized equipment and high-temperature heat carriers exceeding 115oC.
OUR SERVICES

Technical inspection and survey of heating substations

Obtaining technical specifications from PJSC MOEK

Design of IHS, CHS, and external heating networks

Approval of design documentation in PJSC MOEK

Equipment procurement and turnkey material supply

Installation and piping works

Start-up and commissioning tests

Statutory handover and commissioning before PJSC MOEK & Rostekhnadzor

Completed Projects
WORK STAGES
Facility survey and heat load calculations
Development of technical specifications
Obtaining technical conditions from utility suppliers
Engineering design documentation drafting
Design approval with municipal utility suppliers
Industrial safety review and registration with Rostekhnadzor (when required)
COST SAVINGS IN FIGURES
Total Project Investment
-
Equipment
-
Permits & Design
-
Construction Works
-
Other Expenses
Equipment Supply: LLC Energy Plus partners directly with leading heating equipment manufacturers to provide maximum volume discounts
SAVINGS: 10-15% of equipment costs through established direct manufacturer agreements
Technical Client, General Designer and General Contractor Roles: proprietary ERP project management system + multi-disciplinary in-house engineering team
SAVINGS: 7-8% of budget through shortened implementation timelines
Construction and Installation Works: in-house construction department + decades of specialized execution experience
SAVINGS: 10% through advanced technical competencies and machinery
Other Overhead: full alignment of final contract sum with the approved contractual budget
SAVINGS: 5% by eliminating unforeseen expenses during construction