Individual and Central Heating Substations. Design and Construction. Cost Estimation. Expert Review. Budgeting

INDIVIDUAL AND CENTRAL HEATING SUBSTATIONS (IHS and CHS)

DESIGN, PROCUREMENT, INSTALLATION, COMMISSIONING

A Heating Substation is a connection hub between consumers and external district heating networks, designed for heat carrier preparation, parameter regulation before distribution to local building loops, and accurate heat energy metering.

CONSTRUCTION TYPES

Utility Connection

Reconstruction

Technical Modernization

Individual heating substation (ITP)

IHS Schematic Diagram

Company LLC Energy Plus is an accredited partner of PJSC MOEK with full statutory licenses for hazardous industrial facilities (OPO). We successfully engineer and deploy pressurized equipment and high-temperature heat carriers exceeding 115oC.

OUR SERVICES

  • Technical inspection and survey of heating substations

  • Obtaining technical specifications from PJSC MOEK

  • Design of IHS, CHS, and external heating networks

  • Approval of design documentation in PJSC MOEK

  • Equipment procurement and turnkey material supply

  • Installation and piping works

  • Start-up and commissioning tests

  • Statutory handover and commissioning before PJSC MOEK & Rostekhnadzor

Completed Projects

WORK STAGES

Facility survey and heat load calculations

Development of technical specifications

Obtaining technical conditions from utility suppliers

Engineering design documentation drafting

Design approval with municipal utility suppliers

Industrial safety review and registration with Rostekhnadzor (when required)

COST SAVINGS IN FIGURES

Total Project Investment

  • Equipment

  • Permits & Design

  • Construction Works

  • Other Expenses

Project implementation stages

38%

Equipment Supply: LLC Energy Plus partners directly with leading heating equipment manufacturers to provide maximum volume discounts

SAVINGS: 10-15% of equipment costs through established direct manufacturer agreements

Technical Client, General Designer and General Contractor Roles: proprietary ERP project management system + multi-disciplinary in-house engineering team

SAVINGS: 7-8% of budget through shortened implementation timelines

Construction and Installation Works: in-house construction department + decades of specialized execution experience

SAVINGS: 10% through advanced technical competencies and machinery

Other Overhead: full alignment of final contract sum with the approved contractual budget