Engineering and Construction of Main Gas Pipelines (MGP) or Branch Pipelines to Gas Distribution Stations (GDS). Regulatory Documentation. Surveys. Feasibility Studies. Estimate Defense in Glavgosexpertiza. PJSC Gazprom Accreditation

Construction of Main Gas Pipelines (MGP) or Branch Pipelines to Gas Distribution Stations (GDS)

with the possibility of subsequent connection of consumers for various purposes

Gas pipeline directional drilling

Solving this task frequently involves complications when laying main gas pipelines across roadways, water bodies, and rivers. Typically in such situations, the engineering design provides for trenchless pipeline installation via horizontal directional drilling (HDD), microtunneling, or auger boring.

We also possess proven engineering experience laying gas pipelines along the bed of water obstacles (without trenching) using the pulling method.

Gas pipeline engineering drawing

At the pre-project stage, the main criteria when selecting the route of the planned gas pipeline include:

  • ensuring operational reliability

  • minimizing construction and operating expenses

  • minimizing environmental impact

  • ensuring standard clearance distances from GDS and pipeline to existing structures and settlement boundaries

Gas pipeline engineering drawing
Gas pipeline installation

During engineering design, we evaluate alternative route alignments, taking into account GDS siting complexities and constrained environmental conditions.

The pipeline route is selected to minimize earthworks across hillside sections and reduce forest clearing to the minimum possible extent.

Example of an integrated master construction schedule:

Construction schedule
Gas pipeline facility